Another improvement in energy efficiency

03/20/2025

After the recent investment at Marcon plant, with the aim of obtaining maximum performance and minimum energy waste, the intervention on the office building at Delna was also completed, in particular:

  1. creation of a 14 cm thick EPS panel coat on the ground floor of the building
  2. injection of polyurethane foam into the cavities in the basement

Thanks to this, energy efficiency has gone from energy class B to A1