For the office building, in order to achieve maximum efficiency and minimal energy waste, it was decided to invest.
The improvements were in particular:
• construction of coat with EPS type insulating panels 14 cm thick
• attic insulation on crawl space with EPS type insulating panels 14 cm thick
• insulation of crawl space towards the attic with EPS type insulating panels 14 cm thick
• new PVC windows with double glazing with solar control